Mwitari, James Ndoria
(SEMATEC- JKUAT, 2017-12-07)
This study considered a 2.05 km section of the JPCP component of the Kagere –Ndunyu -Munyange–Njigari-Gitugi (E571) road in Othaya, Kenya. The road developed surface cracks within the first 2 years of construction. The ...